Water Well Drilling Projects

Idea
Providing potable drinking water to the besieged Gazans.
Place
Gaza
Features

• Providing potable drinking water to the besieged Gazans.
• Reducing the ıncıdence of kidney failure olue to
salty of water.
• Providing drinking water to needy and poor families.

Project cost

5.714 $
Produce 1000 / lph without desalination plant
11,064 $
Produce 2000 / lph without desalination plant
11,324 $
Produce 1000 / lph with desalination plant
16,674 $
Produce 2000 / lph with desalination plant